Apparently, potty-training should be the tenth way of knowing. Barnard quad third floor residents received an email from the Associate Director for Residential Life detailing the closing of the 3rd floor Hewitt bathroom until April 5. The email detailed the issues with this bathroom, including “feces smeared on toilet seats and the floor, urine on […]
Apocalypse Postponed (By 0.5°C): Columbia And Sciences Po Climate Deans On Optimism, Corporate ESG, And A New Joint Degree
September 30, 2026Who Would These Spots At Columbia Be Paired With On Dancing With The Stars?
September 27, 2026No Strings Attached: The Magic Lantern Anthology Puppet Performance
September 27, 2026No Strings Attached: The Magic Lantern Anthology Puppet Performance
September 27, 2026