In addition to renovations on floors 7 and 8, McBain’s latest changes also include a lofty through breeze from a gaping hole in the ceiling of the floor 2 men’s shower. Keep it classy, McBain. It’s just part of the decor, really.
Sunday night is funday night with Bwog meetings and the weekly CCSC gathering/ritual. This week’s CCSC meeting was full of twists and turns, with the resignation of one representative and a new plan for “behavioral changes” in the community. But what does this mean? Who resigned? Will my ceiling in McBain ever be replaced? Don’t worry, Satow […]
Apocalypse Postponed (By 0.5°C): Columbia And Sciences Po Climate Deans On Optimism, Corporate ESG, And A New Joint Degree
September 30, 2026Who Would These Spots At Columbia Be Paired With On Dancing With The Stars?
September 27, 2026No Strings Attached: The Magic Lantern Anthology Puppet Performance
September 27, 2026No Strings Attached: The Magic Lantern Anthology Puppet Performance
September 27, 2026